Introduction
Initially, WB Power Services were approached by a third party consultant to help design a specification, after they had been appointed by the end user to propose a new power solution, which would act as a back-up power supply for one of their regional data centres. WB Power then worked with the appointed contractors to better define requirements, working through the practicalities of how the project could be delivered without affecting operational capability. Elements detailed within the works included removal of existing power infrastructure, procurement and installation of generating set, acoustic package and a fuel distribution solution.