The operator was in mid-phase of construction of a new data centre in India.
To ensure resilience and quality of equipment, testing and commissioning of power supply equipment such as generators, UPS systems and batteries are essential. This plays a vital role toward the uptime of operations.
A TURNKEY LOAD-TESTING SOLUTION FOR A CONSTRUCTION ENVIRONMENT
In this instance the data centre network operator needed a turnkey load-testing solution. It needed to operate safely and effectively in a volatile and adapting construction environment.
The data centre operator’s customer, is one of the world’s largest technology companies. It had leased a number of server rooms within the new data centre for its IT infrastructure.
They needed robust load-testing services to ensure new equipment was operational to deal with unexpected scenarios and contingencies. As they were operating in a location that did not yet have grid infrastructure in place that could offer complete reliability, this was all the more important.
This is where Aggreko could help.
CONCLUSION
Within just 24 hours, Aggreko had supplied the customer with a turnkey load-testing solution that met their needs.
Read more about this project and the outcome by reading the full case study available via the link.
Case Study from Aggreko
Aggreko support data centres through every stage of their lifecycle, from construction and commissioning to daily operations, upgrades and emergency response.
Visit the Website Sponsor listing for Aggreko on the DATACENTRE.ME DIRECTORY.
For further information about the benefits and how to become Website Sponsors, please visit our Sponsorship Page. You will be able to choose which level would suit your company!