GF Piping Systems Case Study – Stay Cool With Piping Systems Training
Read this case study from Georg Fischer Piping Systems. It describes their work with Kirby Group Engineering during the construction of a data centre in Zurich, Switzerland.
The Project Background
Kirby Group Engineering began construction of a 10MW cooling capacity data centre in Zurich in 2020.
For data centres, the cooling plant is mission critical and for Kirby, finding professional qualified personnel to install the cooling system is key. Time pressures on construction sites mean that installers have to work quickly and accurately, so contractors and personnel are required to be trained and certified correctly.
This is where Georg Fischer Piping Systems were able to help.
The Solution
GF Piping Systems instruction courses teach installers essential knowledge for the welding of pipes and piping components, as well as in-depth understanding of butt and electrofusion jointing.
Kirby entrusted GF Piping Systems to provide in-house and on-site training to Kirby installers to ensure the installation of the plastic pipes was performed and a quality control process was put in place.
The Outcome
Despite 2020 being a difficult year due to the pandemic, with the help of GF Piping Systems, Kirby were able to successfully progress with the data centre build schedule as originally planned.
Read more about this project and the outcome by reading the full case study available via the link found further down this page.
Find out more about Georg Fischer Piping Systems and visit their Website Sponsor listing on the DATACENTRE.ME Directory.
Sign up for your FREE directory listing here. Promote your company by becoming a DATACENTRE.ME Website Sponsor. Please visit our Sponsorship Page for more information. You will be able to choose which level would suit your company. Prices start at just £1,000 for 12 months visibility and a whole host of other benefits! Alternatively, contact us here. We look forward to hearing from you!
Published 2nd August 2021