AGGREKO CASE STUDY – CRITICAL COOLING

Datacentres for better security

Share this Case Study

AGGREKO PROVIDED CRITICAL COOLING TO A STEEL MANUFACTURER TO MAINTAIN PRODUCTION DURING LOCKDOWN

Read the latest case study from Aggreko regarding their provision of critical cooling at a steel manufacturer during lockdown. The customer’s server room cooling equipment suffered a malfunction.

Maintaining a particular temperature was vital to the manufacturing process of the customer.

With disruption to supply chains due to the pandemic, spare parts could have been months from delivery. However, this was where Aggreko were able to help. In less than 24 hours they were able to provide a solution. A mobile, modular air conditioning unit was installed, keeping the server room at an optimum temperature.

In conclusion, you can learn more about this project and the outcome by reading the full Aggreko case study on critical cooling. This is available via the link.

Case Study from Aggreko

Aggreko support data centres through every stage of their lifecycle, from construction and commissioning to daily operations, upgrades and emergency response.

Visit the Website Sponsor listing for Aggreko on the DATACENTRE.ME DIRECTORY.

For further information about the benefits and how to become Website Sponsors, please visit our Sponsorship Page. You will be able to choose which level would suit your company!